Featured Paper by Antonio Gomide Distribution Planning is a very complex task in which the planners must ensure that the system will meet the demand regarding substation and feeder capacity. The basic goal of a distribution utility could be expressed as: Supply of electricity, Good economy and Good safety. The implementation took three years of development. The solution is called GISPLAN, and can perform several types of analysis on existing and planned network: Fault Analysis, Load Flow, Technical Losses Calculations, Load Increase, Outage Management Studies, Reliability Studies, Cost Benefit Ratios Determination, and others.
|
|
|||||||||||||||||||||||
|
||||||||||||||||||||||||
|
||||||||||||||||||||||||