Chartered Reports Results for Second Quarter 2008

Wafer Shipments and Average Selling Prices (eight-inch equivalent)

  • Shipments in second quarter 2008 were 517.3 thousand wafers, an increase of 49.8 percent compared to 345.2 thousand wafers in second quarter 2007. Shipments in second quarter 2008 increased by 21.8 percent compared to 424.8 thousand wafers shipped in first quarter 2008. Shipments including Chartereds share of SMP were 548.5 thousand wafers, an increase of 43.7 percent compared to 381.6 thousand wafers in second quarter 2007. Shipments including Chartereds share of SMP in second quarter 2008 increased by 20.0 percent compared to 457.2 thousand wafers shipped in first quarter 2008.
  • ASP was $864 per wafer in second quarter 2008, compared to $892 per wafer in first quarter 2008. ASP including Chartereds share of SMP was $860 per wafer in second quarter 2008 compared to $885 per wafer in first quarter 2008.

Capacity and Utilization

Capacity utilization in second quarter 2008 was 88 percent compared to 79 percent in the year-ago quarter, and 86 percent in first quarter 2008. Total capacity in second quarter 2008 was up approximately 17 percent sequentially, primarily due to the acquisition of Fab 3E which was completed at the end of first quarter 2008. Capacity utilization is based on total shipments and total capacity, both of which include Chartereds share of SMP.

Utilization Table

 

Data including Chartereds share of SMP

(Thousand 8 equivalent wafers)

  2Q 2007   3Q 2007   4Q 2007   1Q 2008   2Q 2008
Total wafers shipped   381.6   426.1   415.5   457.2   548.5
Total capacity   483.0   502.2   512.4   534.4   624.8

Utilization

  79%   85%   81%   86%   88%

Capacity by Fab

 
(Thousand 8 equivalent wafers)   2Q 2007   3Q 2007   4Q 2007   1Q 2008   2Q 2008  

Est. 3Q
2008

Fab 2   153.8   155.5   155.5   153.8   153.8   155.5
Fab 3   70.3   70.4   70.4   74.8   80.4   90.3
Fab 3E (a)   -   -   -   -   74.3   75.1
Fab 5 (Chartered s share)   34.9   35.3   35.3   35.5   35.5   35.9
Fab 6   115.8   117.0   120.0   120.2   126.2   127.4
Fab 7   108.2   124.0   131.2   150.1   154.6   177.9
Total   483.0   502.2   512.4   534.4   624.8   662.1

(a) Eight-inch wafer fabrication facility acquired in March 2008.


« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7  Next Page »



Review Article Be the first to review this article

Harris

Featured Video
Jobs
Water Quality Analyst for City of Arvada at Arvada, Colorado
Geographical Information System (GIS) Analyst for State of South Dakota at Pierre, South Dakota
Geographic Information System (GIS) Analyst for SHRA at Sacramento, California
GIS Analyst for Dekalb County at Decatur, Georgia
MECHANICAL ENGINEER for VEi Global, Inc. at Fargo, North Dakota
Senior Engineer for Specsys inc at Montevideo, Minnesota
Upcoming Events
International LiDAR Mapping Forum 2019 at Hyatt Regency Denver Colorado Convention Center, 650 15th Street Denver CO - Jan 28 - 30, 2019
Defence Geospatial Intelligence (DGI) 2019 at Royal Lancaster London London United Kingdom - Jan 28 - 30, 2019
DistribuTECH 2019 at Ernest N. Morial Convention Center New Orleans LA - Feb 5 - 7, 2019
ArcGIS: Introduction at Environmental and Natural Resource Building New Brunswick NJ - Feb 7 - 28, 2019
University of Denver GIS Masters Degree Online



Internet Business Systems © 2019 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering EDACafe - Electronic Design Automation TechJobsCafe - Technical Jobs and Resumes  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise